Pictures showing step-by-step operations carried out in the refurbishment of the artificial wicket by Plandscape in March 2008.  Run your mouse over each picture for a description. 

Old Strip   Old Mat and Shock Pad Have Been Dragged Off Using 4x4 Vehicle

 Exposed Granular Stone Base   Rolling the Applied Regulating Stone Material

Blinding Reflection off the New Shock Pad   Rolling out the Carpet

Pavilion End is Nailed Down   Sides are Nailed Down

Tensioning Has Been Removed from Road End of Mat   Finished Surface With Seeded Topsoil on Edges

Invisible Man Pulls Light Roller   Stump Camera View from Pavilion End